Interstate Bridge

World's Toughest Fixes Season 3 Episode 8

Overview:
In Utah, Riley joins a crew of more than 300 engineers, contractors and laborers as they gamble on an innovative installation technique: demolishing a crumbling concrete bridge and installing a new throughway bridge in just four days (WTF!). This fix involves huge remote-controlled trailers, enormous hydraulics, and a 4 million-pound, five-lane bridge that must be transported almost two miles before it is installed in one piece on Interstate 80 in Salt Lake City.

Genre : Documentary

Actors : Sean Riley

Release Date : 2010-06-24

Duration : 60 menit

Rating : ⭐ 0/10 (0 votes)

▶ Play

Select Season

Other Episodes (Season 3)

Rocky Mountain Rigging
1. Rocky Mountain Rigging
Extreme Bridges
2. Extreme Bridges
Fixing Vegas
3. Fixing Vegas
Extreme Heights
4. Extreme Heights
Cruise Ship Overhaul
5. Cruise Ship Overhaul
Philly Mega Transit
6. Philly Mega Transit
San Francisco Bridge
7. San Francisco Bridge
Interstate Bridge
8. Interstate Bridge
Alaskan Salvage
9. Alaskan Salvage
Sky High Texas Tower
10. Sky High Texas Tower
Salt Lake City Sky Bridge
11. Salt Lake City Sky Bridge
Ultimate Water Ride
12. Ultimate Water Ride


TV Series Recommendations